Author: Baxevanis, P.
Paper Title Page
THZE2 Developing Control System Specifications and Requirements for Electron Ion Collider 901
 
  • A. Blednykh, D.M. Gassner
    Brookhaven National Laboratory (BNL), Electron-Ion Collider, Upton, New York, USA
  • E.C. Aschenauer, P. Baxevanis, M. Blaskiewicz, K.A. Drees, T. Hayes, J.P. Jamilkowski, G.J. Marr, S. Nemesure, V. Schoefer, T.C. Shrey, K.S. Smith, F.J. Willeke
    BNL, Upton, New York, USA
  • L.R. Dalesio
    EPIC Consulting, Medford, New York, USA
 
  An Accelerator Research facility is a unique science and engineering challenge in that the requirements for developing a robust, optimized science facility are limited by engineering and cost limitations. Each facility is planned to achieve some science goal within a given schedule and budget and is then expected to operate for three decades. In three decades, the mechanical systems and the industrial IO to control them is not likely to change. In that same time, electronics will go through some 4 generations of change. The software that integrates the systems and provides tools for operations, automation, data analysis and machine studies will have many new standards. To help understand the process of designing and planning such a facility, we explain the specifications and requirements for the Electron Ion Collider (EIC) from both a physics and engineering perspective.  
slides icon Slides THZE2 [5.375 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-NAPAC2022-THZE2  
About • Received ※ 04 August 2022 — Revised ※ 10 August 2022 — Accepted ※ 11 August 2022 — Issue date ※ 13 September 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)