Author: Calvey, J.R.
Paper Title Page
TUZE6 Studies of Ion Instability Using a Gas Injection System 347
 
  • J.R. Calvey, M. Borland, L. Emery, P.S. Kallakuri
    ANL, Lemont, Illinois, USA
 
  Funding: Work supported by U. S. Department of Energy, Office of Science, under Contract No. DE-AC02-06CH11357.
Ion trapping occurs when a negatively charged beam ionizes residual gas inside an accelerator vacuum chamber, and the resulting ions become trapped in the beam potential. Trapped ions can cause a variety of undesirable effects, including coherent instability and incoherent emittance growth. Because of the challenging emittance and stability requirements of next generation light sources, ion trapping is a serious concern. To study this effect at the present APS, a gas injection system was designed and installed at two different locations in the ring. The system creates a controlled and localized pressure bump of nitrogen gas, so the resulting ion instability can be studied. Measurements were taken under a wide variety of beam conditions, using a spectrum analyzer, pinhole camera, and bunch-by-bunch feedback system. The feedback system was also used to perform grow-damp measurements, allowing us to measure the growth rate of individual unstable modes. This paper will present some of the results of these experiments. Simulations using the IONEFFECTS element in the particle tracking code elegant will also be presented.
 
slides icon Slides TUZE6 [2.425 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-NAPAC2022-TUZE6  
About • Received ※ 03 August 2022 — Revised ※ 07 August 2022 — Accepted ※ 10 August 2022 — Issue date ※ 24 August 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPA22 Measurements of Bunch Length in the Advanced Photon Source Booster Synchrotron 394
 
  • J.C. Dooling, W. Berg, J.R. Calvey, K.C. Harkay, K.P. Wootton
    ANL, Lemont, Illinois, USA
 
  Funding: Work supported by the U.S. D.O.E.,Office of Science, Office of Basic Energy Sciences, under contract number DE-AC02- 06CH11357.
A bunch duration monitor (BDM) was installed at the end of a synchrotron light monitor (SLM) port in the Advanced Photon Source (APS) booster synchrotron. The BDM is based on a fast Hamamatsu metal-semiconductor-metal detector with nominal rise and fall times of 30 ps. Bunch length data is especially important as the bunch charge will be raised from 3 nC, used in the existing machine, to as much as 18 nC for APS-Upgrade operation. During preliminary high-charge studies, the SLM image is observed to move over a period of minutes while the BDM signal intensity varies; the motion is likely due to thermal loading of the in-tunnel synchrotron light mirror. Work is underway to stabilize the position using a simple feedback system and motorized mirror mount, as well as a new synchrotron light mirror assembly with improved thermal load handling. The feedback system will maintain optical alignment on the BDM at an optimum position based on the SLM centroid location. The optical layout and feedback system will be presented along with preliminary bunch length data.
 
DOI • reference for this paper ※ doi:10.18429/JACoW-NAPAC2022-TUPA22  
About • Received ※ 04 August 2022 — Revised ※ 09 August 2022 — Accepted ※ 10 August 2022 — Issue date ※ 09 September 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPA23 First Beam Results Using the 10-kW Harmonic Rf Solid-State Amplifier for the APS Particle Accumulator Ring 398
 
  • K.C. Harkay, T.G. Berenc, J.R. Calvey, J.C. Dooling, H. Shang, T.L. Smith, Y. Sun, U. Wienands
    ANL, Lemont, Illinois, USA
 
  Funding: Work supported by U. S. Department of Energy, Office of Science, under Contract No. DE-AC02-06CH11357.
The Advanced Photon Source (APS) particle accumulator ring (PAR) was designed to accumulate linac pulses into a single bunch using a fundamental radio frequency (rf) system, and longitudinally compress the beam using a harmonic rf system prior to injection into the booster. The APS Upgrade injectors will need to supply full-current bunch replacement with high single-bunch charge for swap-out injection in the new storage ring. Significant bunch lengthening is observed in the PAR at high charge, which negatively affects beam capture in the booster. Predictions showed that the bunch length could be compressed to better match the booster acceptance using a combination of higher beam energy and higher harmonic gap voltage. A new 10-kW harmonic rf solid-state amplifier (SSA) was installed in 2021 to raise the gap voltage and improve bunch compression. The SSA has been operating reliably. Initial results show that the charge-dependent bunch lengthening in PAR with higher gap voltage agrees qualitatively with predictions. A tool was written to automate bunch length data acquisition. Future plans to increase the beam energy, which makes the SSA more effective, will also be summarized.
 
poster icon Poster TUPA23 [2.477 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-NAPAC2022-TUPA23  
About • Received ※ 03 August 2022 — Revised ※ 05 August 2022 — Accepted ※ 09 August 2022 — Issue date ※ 07 October 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THYD4 Progress on the APS-U Injector Upgrade 859
 
  • J.R. Calvey, T. Fors, K.C. Harkay, U. Wienands
    ANL, Lemont, Illinois, USA
 
  Funding: Work supported by U. S. Department of Energy, Office of Science, under Contract No. DE-AC02-06CH11357.
For the APS-Upgrade, it was decided to leave the present APS injector chain in place and make individual improvements where needed. The main challenges faced by the injectors are delivering a high charge bunch (up to 16 nC in a single shot) to the storage ring, operating the booster synchrotron and storage ring at different rf frequencies, and maintaining good charge stability during APS-U operations. This paper will summarize recent progress on the injector upgrade. Topics include bucket targeting with the new injection/extraction timing system (IETS), modeling of high charge longitudinal instability in the PAR, and measurements of charge stability for different modes of operation.
 
slides icon Slides THYD4 [2.015 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-NAPAC2022-THYD4  
About • Received ※ 19 July 2022 — Accepted ※ 11 August 2022 — Issue date ※ 22 August 2022  
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)