Paper | Title | Page |
---|---|---|
THYD4 | Progress on the APS-U Injector Upgrade | 859 |
|
||
Funding: Work supported by U. S. Department of Energy, Office of Science, under Contract No. DE-AC02-06CH11357. For the APS-Upgrade, it was decided to leave the present APS injector chain in place and make individual improvements where needed. The main challenges faced by the injectors are delivering a high charge bunch (up to 16 nC in a single shot) to the storage ring, operating the booster synchrotron and storage ring at different rf frequencies, and maintaining good charge stability during APS-U operations. This paper will summarize recent progress on the injector upgrade. Topics include bucket targeting with the new injection/extraction timing system (IETS), modeling of high charge longitudinal instability in the PAR, and measurements of charge stability for different modes of operation. |
||
Slides THYD4 [2.015 MB] | ||
DOI • | reference for this paper ※ doi:10.18429/JACoW-NAPAC2022-THYD4 | |
About • | Received ※ 19 July 2022 — Accepted ※ 11 August 2022 — Issue date ※ 22 August 2022 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |