Author: Johnson, D.E.
Paper Title Page
THZD6 An 8 GeV Linac as the Booster Replacement in the Fermilab Power Upgrade 897
 
  • D.V. Neuffer, S.A. Belomestnykh, M. Checchin, D.E. Johnson, S. Posen, E. Pozdeyev, V.S. Pronskikh, A. Saini, N. Solyak, V.P. Yakovlev
    Fermilab, Batavia, Illinois, USA
 
  Funding: Work supported by the Fermi National Accelerator Laboratory, managed and operated by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the U.S. Department of Energy.
In­creas­ing the Main In­jec­tor (MI) beam power above ~1.2 MW re­quires re­place­ment of the 8-GeV Booster by a higher in­ten­sity al­ter­na­tive. In the Pro­ject X era, rapid-cy­cling syn­chro­tron (RCS) and linac so­lu­tions were con­sid­ered for this pur­pose. In this paper, we con­sider the linac ver­sion that pro­duces 8 GeV H beam for in­jec­tion into the Re­cy­cler Ring (RR) or Main In­jec­tor (MI). The linac takes ~1-GeV beam from the PIP-II Linac and ac­cel­er­ates it to ~2 GeV in a 650-MHz SRF linac, fol­lowed by a 8-GeV pulsed linac using 1300 MHz cry­omod­ules. The linac com­po­nents in­cor­po­rate re­cent im­prove­ments in SRF tech­nol­ogy. Re­search needed to im­ple­ment the high power SRF Linac is de­scribed.
 
slides icon Slides THZD6 [4.078 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-NAPAC2022-THZD6  
About • Received ※ 03 August 2022 — Revised ※ 11 August 2022 — Accepted ※ 12 August 2022 — Issue date ※ 04 October 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)