MOPA29 Second Generation Fermilab Main Injector 8 GeV Beamline Collimation Preliminary Design 116
 
  • K.J. Hazelwood, P. Adamson, B.C. Brown, D. Capista, R.M. Donahue, B.L. Klein, N.V. Mokhov, V.S. Pronskikh, V.I. Sidorov, M.C. Vincent
    Fermilab, Batavia, Illinois, USA
 
  The current Fermilab Main Injector 8 GeV beamline transverse collimation system was installed in 2006. Since then, proton beam intensities and rates have increased significantly. With the promise of even greater beam intensities and a faster repetition rate when the PIP-II upgrade completes later this decade, the current collimation system will be insufficient. Over the past 18 months, multiple collimation designs have been investigated, some more traditional and others novel. A preliminary design review was conducted and a design chosen. Work is underway to finalize the chosen design, prototype some of its novel components and procure parts for installation Summer 2023.  
DOI • reference for this paper ※ doi:10.18429/JACoW-NAPAC2022-MOPA29  
About • Received ※ 03 August 2022 — Revised ※ 08 August 2022 — Accepted ※ 15 August 2022 — Issue date ※ 25 September 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)