MOPA29 Second Generation Fermilab Main Injector 8 GeV Beamline Collimation Preliminary Design 116
 
  • K.J. Hazelwood, P. Adamson, B.C. Brown, D. Capista, R.M. Donahue, B.L. Klein, N.V. Mokhov, V.S. Pronskikh, V.I. Sidorov, M.C. Vincent
    Fermilab, Batavia, Illinois, USA
 
  The current Fermilab Main Injector 8 GeV beamline transverse collimation system was installed in 2006. Since then, proton beam intensities and rates have increased significantly. With the promise of even greater beam intensities and a faster repetition rate when the PIP-II upgrade completes later this decade, the current collimation system will be insufficient. Over the past 18 months, multiple collimation designs have been investigated, some more traditional and others novel. A preliminary design review was conducted and a design chosen. Work is underway to finalize the chosen design, prototype some of its novel components and procure parts for installation Summer 2023.  
DOI • reference for this paper ※ doi:10.18429/JACoW-NAPAC2022-MOPA29  
About • Received ※ 03 August 2022 — Revised ※ 08 August 2022 — Accepted ※ 15 August 2022 — Issue date ※ 25 September 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THZD6 An 8 GeV Linac as the Booster Replacement in the Fermilab Power Upgrade 897
 
  • D.V. Neuffer, S.A. Belomestnykh, M. Checchin, D.E. Johnson, S. Posen, E. Pozdeyev, V.S. Pronskikh, A. Saini, N. Solyak, V.P. Yakovlev
    Fermilab, Batavia, Illinois, USA
 
  Funding: Work supported by the Fermi National Accelerator Laboratory, managed and operated by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the U.S. Department of Energy.
Increasing the Main Injector (MI) beam power above ~1.2 MW requires replacement of the 8-GeV Booster by a higher intensity alternative. In the Project X era, rapid-cycling synchrotron (RCS) and linac solutions were considered for this purpose. In this paper, we consider the linac version that produces 8 GeV H beam for injection into the Recycler Ring (RR) or Main Injector (MI). The linac takes ~1-GeV beam from the PIP-II Linac and accelerates it to ~2 GeV in a 650-MHz SRF linac, followed by a 8-GeV pulsed linac using 1300 MHz cryomodules. The linac components incorporate recent improvements in SRF technology. Research needed to implement the high power SRF Linac is described.
 
slides icon Slides THZD6 [4.078 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-NAPAC2022-THZD6  
About • Received ※ 03 August 2022 — Revised ※ 11 August 2022 — Accepted ※ 12 August 2022 — Issue date ※ 04 October 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)