Author: Proskin, S.
Paper Title Page
WEPA41 Maximizing Output of 3 MeV S-band Industrial Accelerator 723
 
  • D. Fischer, M. Denney, A.V. Mishin, S. Proskin, J. Roylance, L. Young
    Varex Imaging, Salt Lake City, USA
 
  Ear­lier, we have re­ported on a record-break­ing 3-MeV Ac­cel­er­a­tor Beam Cen­ter­line (ABC) built in 2017-2018. An up­graded ver­sion of this 3-MeV S-band ABC has been de­vel­oped at Varex Imag­ing as a key com­po­nent for one of the most pop­u­lar X-ray in­dus­trial lin­ear ac­cel­er­a­tor sys­tems, com­monly used for se­cu­rity and NDT ap­pli­ca­tions. Being sig­nif­i­cantly strained by ex­ces­sive back­stream­ing, in­creas­ing of the ABC out­put is a chal­leng­ing task. We de­scribe these chal­lenges and high­light high power test re­sults. The tri­ode gun and struc­ture de­sign im­prove­ments al­lowed us to raise sta­ble out­put up to 530 Rad/min/1m at 3 MeV and up to 220 Rad/min/1m at 4.5 MeV with a widely avail­able 2.5-MW/2.7-kW mag­netron, while main­tain­ing the spot size at 2 mm.  
DOI • reference for this paper ※ doi:10.18429/JACoW-NAPAC2022-WEPA41  
About • Received ※ 03 August 2022 — Revised ※ 08 August 2022 — Accepted ※ 11 August 2022 — Issue date ※ 20 September 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)