Author: Sukhanov, A.I.
Paper Title Page
MOPA27 Validation of the 650 MHz SRF Tuner on the Low and High Beta Cavities for PIP-II at 2 K 109
 
  • C. Contreras-Martinez, S.K. Chandrasekaran, S. Cheban, G.V. Eremeev, I.V. Gonin, T.N. Khabiboulline, Y.M. Pischalnikov, O.V. Prokofiev, A.I. Sukhanov, J.C. Yun
    Fermilab, Batavia, Illinois, USA
 
  The PIP-II linac will include thirty-six BG=0.61 and twenty-four BG=0.92 650 MHz 5 cell elliptical SRF cavities. Each cavity will be equipped with a tuning system consisting of a double lever slow tuner for coarse frequency tuning and a piezoelectric actuator for fine frequency tuning. The same tuner will be used for both the BG=0.61 and BG=0.92 cavities. Results of testing the cavity-tuner system for the BG=0.61 will be presented for the first time.  
poster icon Poster MOPA27 [0.782 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-NAPAC2022-MOPA27  
About • Received ※ 03 August 2022 — Revised ※ 10 August 2022 — Accepted ※ 11 August 2022 — Issue date ※ 04 October 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)