Paper | Title | Page |
---|---|---|
WEZD3 | Magnetron R&D Progress for High Efficiency CW RF Sources of Industrial Accelerators | 597 |
|
||
Funding: Authored by Jefferson Science Associates, LLC under U.S. DOE Contract No. DE-AC05-06OR23177, and DOE OS/HEP Accelerator Stewardship award 2019-2022. After the demonstration of using high efficiency magnetron power to combine and aim to drive a radio frequency accelerator at 2450MHz in CW mode [1], we have used trim coils adding to a water-cooled magnetron and three amplitude modulation methods in an open-loop control to further suppress the 120Hz side-band noise to -46.7dBc level. We have also successfully demonstrated the phase-locking to an industrial grade cooking magnetron transmitter at 915MHz with a 75kW CW power delivered to a water load by using a -26.6dBc injection signal. The sideband noise at 360Hz from the 3-Phase SCRs DC power supply can be reduced to -16.2dBc level. Their power combing scheme and higher power application to industrial accelerators are foreseeing. [1] H. Wang, et al, Magnetron R&D for High Efficiency CW RF Sources for Industrial Accelerators, TUPAB348, 12th Int. Particle Acc. Conf. IPAC2021, Campinas, SP, Brazil. |
||
Slides WEZD3 [3.074 MB] | ||
DOI • | reference for this paper ※ doi:10.18429/JACoW-NAPAC2022-WEZD3 | |
About • | Received ※ 18 July 2022 — Revised ※ 25 July 2022 — Accepted ※ 08 August 2022 — Issue date ※ 11 August 2022 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
WEZD6 | Manufacturing the Harmonic Kicker Cavity Prototype for the Electron-Ion Collider | 601 |
|
||
Funding: This material is based upon work supported by the U.S. Department of Energy, Office of Science, Office of Nuclear Physics under contract DE-AC05-06OR23177 High-bunch-frequency beam-separation schemes, such as the injection scheme proposed for the Rapid Cycling Synchrotron at the Electron-Ion Collider, demand rise and fall times an order of magnitude below what can realistically be accomplished with a stripline kicker. Nanosecond-time-scale kick waveforms can instead be obtained by Fourier synthesis in a harmonically resonant quarter-wave radio-frequency cavity which is optimized for high shunt impedance. Originally developed for the Jefferson Lab Electron-Ion Collider (JLEIC) Circulator Cooler Ring, a hypothetical 11-pass ring driven by an energy-recovery linac at Jefferson Lab, our high-power prototype of such a harmonic kicker cavity, which operates at five modes at the same time, will demonstrate the viability of this concept with a beam test at Jefferson Lab. As the geometry of the cavity, tight mechanical tolerances, and number of ports complicate the design and manufacturing process, special care must be given to the order of the manufacturing steps. We present our experiences with the manufacturability of the present design, lessons learned, and first RF test results from the prototype. |
||
Slides WEZD6 [12.312 MB] | ||
DOI • | reference for this paper ※ doi:10.18429/JACoW-NAPAC2022-WEZD6 | |
About • | Received ※ 04 August 2022 — Revised ※ 05 August 2022 — Accepted ※ 18 August 2022 — Issue date ※ 31 August 2022 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
WEPA12 | Operational Experience of the New Booster Cryomodule at the Upgraded Injector Test Facility | 640 |
|
||
Funding: This material is based upon work supported by the U.S. Department of Energy, Office of Science, Office of Nuclear Physics under contract DE-AC05-06OR23177. Since the early 1990s, the injector of the CEBAF accelerator at Jefferson Lab has relied on a normal-conducting RF graded-beta capture section to boost the kinetic energy of the electron beam from 100 / 130 keV to 600 keV for subsequent acceleration using a cryomodule housing two superconducting 5-cell cavities similar to those used throughout the accelerator. To simplify the injector design and improve the beam quality, the normal-conducting RF capture section and the cryomodule will be replaced with a new single booster cryomodule employing a superconducting, β = 0.6, 2-cell-cavity capture section and a single, β = 0.97, 7-cell cavity. The Upgraded Injector Test Facility at Jefferson Lab is currently hosting the new cryomodule to evaluate its performance with beam before installation at CEBAF. While demonstrating satisfactory performance of the booster and good agreement with simulations, our beam test results also speak to limitations of accelerator operations in a noisy, thermally unregulated environment. |
||
Poster WEPA12 [3.726 MB] | ||
DOI • | reference for this paper ※ doi:10.18429/JACoW-NAPAC2022-WEPA12 | |
About • | Received ※ 03 August 2022 — Revised ※ 07 August 2022 — Accepted ※ 11 August 2022 — Issue date ※ 06 September 2022 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |