Keyword: injection
Paper Title Other Keywords Page
MOPA82 Space Charge Driven Third Order Resonance at AGS Injection resonance, experiment, emittance, space-charge 236
 
  • M.A. Balcewicz, Y. Hao
    FRIB, East Lansing, Michigan, USA
  • Y. Hao, H. Huang, C. Liu, K. Zeno
    BNL, Upton, New York, USA
 
  Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-SC0012704 with the U.S. Department of Energy
Resonance line crossings at significant space charge tune shifts can exhibit various phenomena due to periodic resonance crossing from synchrotron motion* and manifests as halo generation and bunch shortening along with the more mundane emittance growth and beam loss. An injection experiment is conducted at the AGS using the fast wall current monitor and electron collecting Ionization Profile Monitor (eIPM) to probe third order resonances to better characterize the resonance crossing over a 4 ms time scale. This experiment shows some agreement with previous experiments, save for lack of bunch shortening, possibly due to relative resonance strength.
* G. Franchetti et al. PRSTAB 13, 114203. 2010
 
poster icon Poster MOPA82 [1.924 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-NAPAC2022-MOPA82  
About • Received ※ 02 August 2022 — Revised ※ 09 August 2022 — Accepted ※ 19 August 2022 — Issue date ※ 24 August 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUYE4 Machine Learning for Anomaly Detection and Classification in Particle Accelerators network, linac, operation, controls 311
 
  • I. Lobach, M. Borland, K.C. Harkay, N. Kuklev, A. Sannibale, Y. Sun
    ANL, Lemont, Illinois, USA
 
  Funding: The work is supported by the U.S. Department of Energy, Office of Science, Office of Basic Energy Sciences, under Contract No. DE-AC02-06CH11357.
We explore the possibility of using a Machine Learning (ML) algorithm to identify the source of occasional poor performance of the Particle Accumulator Ring (PAR) and the Linac-To-PAR (LTP) transport line, which are parts of the injector complex of the Advanced Photon Source (APS) at Argonne National Lab. The cause of reduced injection or extraction efficiencies may be as simple as one parameter being out of range. Still, it may take an expert considerable time to notice it, whereas a well-trained ML model can point at it instantly. In addition, a machine expert might not be immediately available when a problem occurs. Therefore, we began by focusing on such single-parameter anomalies. The training data were generated by creating controlled perturbations of several parameters of PAR and LTP one-by-one, while continuously logging all available process variables. Then, several ML classifiers were trained to recognize certain signatures in the logged data and link them to the sources of poor machine performance. Possible applications of autoencoders and variational autoencoders for unsupervised anomaly detection and for anomaly clustering were considered as well.
 
slides icon Slides TUYE4 [9.534 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-NAPAC2022-TUYE4  
About • Received ※ 03 August 2022 — Revised ※ 07 August 2022 — Accepted ※ 08 August 2022 — Issue date ※ 28 August 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUZE6 Studies of Ion Instability Using a Gas Injection System simulation, feedback, emittance, experiment 347
 
  • J.R. Calvey, M. Borland, L. Emery, P.S. Kallakuri
    ANL, Lemont, Illinois, USA
 
  Funding: Work supported by U. S. Department of Energy, Office of Science, under Contract No. DE-AC02-06CH11357.
Ion trapping occurs when a negatively charged beam ionizes residual gas inside an accelerator vacuum chamber, and the resulting ions become trapped in the beam potential. Trapped ions can cause a variety of undesirable effects, including coherent instability and incoherent emittance growth. Because of the challenging emittance and stability requirements of next generation light sources, ion trapping is a serious concern. To study this effect at the present APS, a gas injection system was designed and installed at two different locations in the ring. The system creates a controlled and localized pressure bump of nitrogen gas, so the resulting ion instability can be studied. Measurements were taken under a wide variety of beam conditions, using a spectrum analyzer, pinhole camera, and bunch-by-bunch feedback system. The feedback system was also used to perform grow-damp measurements, allowing us to measure the growth rate of individual unstable modes. This paper will present some of the results of these experiments. Simulations using the IONEFFECTS element in the particle tracking code elegant will also be presented.
 
slides icon Slides TUZE6 [2.425 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-NAPAC2022-TUZE6  
About • Received ※ 03 August 2022 — Revised ※ 07 August 2022 — Accepted ※ 10 August 2022 — Issue date ※ 24 August 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPA11 Magnet System for a Compact Microtron Source microtron, electron, cavity, extraction 363
 
  • S.A. Kahn, R.J. Abrams, M.A. Cummings, R.P. Johnson, G.M. Kazakevich
    Muons, Inc, Illinois, USA
 
  Funding: Work supported in part by U.S. D.O.E. SBIR grant DE-SC0013795.
A microtron can be an effective intense electron source. It can use less RF power than a linac to produce a similar energy because the beam will pass through the RF cavity several times. To produce a high-quality low-emittance beam with a microtron requires a magnetic system with a field uniformity $δ B/B<0.001. Field quality for a compact microtron with fewer turns is more difficult to achieve. In this study we describe the magnet for a compact S-band microtron that will achieve the necessary field requirements. The shaping of the magnet poles and shimming of the magnet iron at the outer extent of the poles will be employed to provide field uniformity. The extraction of the beam will be discussed.
 
DOI • reference for this paper ※ doi:10.18429/JACoW-NAPAC2022-TUPA11  
About • Received ※ 04 August 2022 — Revised ※ 14 August 2022 — Accepted ※ 06 September 2022 — Issue date ※ 08 October 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPA13 Affordable, Efficient Injection-Locked Magnetrons for Superconducting Cavities cavity, electron, controls, GUI 366
 
  • M. Popovic, M.A. Cummings, R.P. Johnson, S.A. Kahn, R.R. Lentz, M.L. Neubauer, T. Wynn
    Muons, Inc, Illinois, USA
  • T. Blassick, J.K. Wessel
    Richardson Electronics Ltd, Lafox, Illinois, USA
 
  Funding: DE-SC0022586.
Existing magnetrons that are typically used to study methods of control or lifetime improvements for SRF accelerators are built for much different applications such kitchen microwave ovens (1kW, 2.45 GHz) or industrial heating (100 kW, 915 MHz). In this project, Muons, Inc. will work with an industrial partner to develop fast and flexible manufacturing techniques to allow many ideas to be tested for construction variations that enable new phase and amplitude injection locking control methods, longer lifetime, and inexpensive refurbishing resulting in the lowest possible life-cycle costs. In Phase II magnetron sources will be tested on SRF cavities to accelerate an electron beam at JLab. A magnetron operating at 650 MHz will be constructed and tested with our novel patented subcritical voltage operation methods to drive an SRF cavity. The choice of 650 MHz is an optimal frequency for magnetron efficiency. The critical areas of magnetron manufacturing and design affecting life-cycle costs that will be modeled for improvement include: Qext, filaments, magnetic field, vane design, and novel control of outgassing.
 
DOI • reference for this paper ※ doi:10.18429/JACoW-NAPAC2022-TUPA13  
About • Received ※ 05 August 2022 — Revised ※ 11 August 2022 — Accepted ※ 12 August 2022 — Issue date ※ 23 August 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPA19 Avoiding Combinatorial Explosion in Simulation of Multiple Magnet Errors in Swap-Out Safety Tracking for the Advanced Photon Source Upgrade photon, simulation, lattice, storage-ring 386
 
  • M. Borland, R. Soliday
    ANL, Lemont, Illinois, USA
 
  Funding: Work supported by the U.S. Department of Energy, Office of Science, Office of Basic Energy Sciences, under Contract No. DE-AC02-06CH11357.
The Advanced Photon Source (APS) is upgrading the storage ring to a hybrid seven-bend-achromat design with reverse bends, providing a natural emittance of 41 pm at 6 GeV. The small dynamic acceptance entails operation in on-axis swap-out mode. Careful consideration is required of the safety implications of injection with shutters open. Tracking studies require simulation of multiple simultaneous magnet errors, some combinations of which may introduce potentially dangerous conditions. A naive grid scan of possible errors, while potentially very complete, would be prohibitively time-consuming. We describe a different approach using biased sampling of particle distributions from successive scans. We also describe other aspects of the simulations, such as use of 3D field maps and a highly detailed aperture model.
 
DOI • reference for this paper ※ doi:10.18429/JACoW-NAPAC2022-TUPA19  
About • Received ※ 01 August 2022 — Revised ※ 07 August 2022 — Accepted ※ 09 August 2022 — Issue date ※ 10 September 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPA23 First Beam Results Using the 10-kW Harmonic Rf Solid-State Amplifier for the APS Particle Accumulator Ring booster, photon, rf-amplifier, linac 398
 
  • K.C. Harkay, T.G. Berenc, J.R. Calvey, J.C. Dooling, H. Shang, T.L. Smith, Y. Sun, U. Wienands
    ANL, Lemont, Illinois, USA
 
  Funding: Work supported by U. S. Department of Energy, Office of Science, under Contract No. DE-AC02-06CH11357.
The Advanced Photon Source (APS) particle accumulator ring (PAR) was designed to accumulate linac pulses into a single bunch using a fundamental radio frequency (rf) system, and longitudinally compress the beam using a harmonic rf system prior to injection into the booster. The APS Upgrade injectors will need to supply full-current bunch replacement with high single-bunch charge for swap-out injection in the new storage ring. Significant bunch lengthening is observed in the PAR at high charge, which negatively affects beam capture in the booster. Predictions showed that the bunch length could be compressed to better match the booster acceptance using a combination of higher beam energy and higher harmonic gap voltage. A new 10-kW harmonic rf solid-state amplifier (SSA) was installed in 2021 to raise the gap voltage and improve bunch compression. The SSA has been operating reliably. Initial results show that the charge-dependent bunch lengthening in PAR with higher gap voltage agrees qualitatively with predictions. A tool was written to automate bunch length data acquisition. Future plans to increase the beam energy, which makes the SSA more effective, will also be summarized.
 
poster icon Poster TUPA23 [2.477 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-NAPAC2022-TUPA23  
About • Received ※ 03 August 2022 — Revised ※ 05 August 2022 — Accepted ※ 09 August 2022 — Issue date ※ 07 October 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEZD3 Magnetron R&D Progress for High Efficiency CW RF Sources of Industrial Accelerators controls, power-supply, feedback, experiment 597
 
  • H. Wang, K. Jordan, R.M. Nelson, S.A. Overstreet, R.A. Rimmer
    JLab, Newport News, Virginia, USA
  • J.N. Blum
    VCU, Richmond, Virginia, USA
  • B.R.L. Coriton, C.P. Moeller, K.A. Thackston
    GA, San Diego, California, USA
  • J.L. Vega
    The College of William and Mary, Williamsburg, Virginia, USA
  • G. Ziemyte
    UKY, Kentucky, USA
 
  Funding: Authored by Jefferson Science Associates, LLC under U.S. DOE Contract No. DE-AC05-06OR23177, and DOE OS/HEP Accelerator Stewardship award 2019-2022.
After the demonstration of using high efficiency magnetron power to combine and aim to drive a radio frequency accelerator at 2450MHz in CW mode [1], we have used trim coils adding to a water-cooled magnetron and three amplitude modulation methods in an open-loop control to further suppress the 120Hz side-band noise to -46.7dBc level. We have also successfully demonstrated the phase-locking to an industrial grade cooking magnetron transmitter at 915MHz with a 75kW CW power delivered to a water load by using a -26.6dBc injection signal. The sideband noise at 360Hz from the 3-Phase SCRs DC power supply can be reduced to -16.2dBc level. Their power combing scheme and higher power application to industrial accelerators are foreseeing.
[1] H. Wang, et al, Magnetron R&D for High Efficiency CW RF Sources for Industrial Accelerators, TUPAB348, 12th Int. Particle Acc. Conf. IPAC2021, Campinas, SP, Brazil.
 
slides icon Slides WEZD3 [3.074 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-NAPAC2022-WEZD3  
About • Received ※ 18 July 2022 — Revised ※ 25 July 2022 — Accepted ※ 08 August 2022 — Issue date ※ 11 August 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPA33 Laser Stripping for 1.3 GeV H Beam at the SNS laser, photon, emittance, experiment 702
 
  • T.V. Gorlov, A.V. Aleksandrov, S.M. Cousineau, Y. Liu, A.R. Oguz
    ORNL, Oak Ridge, Tennessee, USA
  • M.J. Kay
    UTK, Knoxville, Tennessee, USA
  • P.K. Saha
    JAEA/J-PARC, Tokai-mura, Japan
 
  Funding: This work has been authored by UT-Battelle, LLC, under Contract No. DE-AC05-00OR22725 with the U.S. Department of Energy.
A realistic full duty factor laser stripping charge exchange injection scheme for future 1.3 GeV beam at the SNS is considered. Different schemes of laser stripping involving combinations of photoexcitation, photoionization and magnetic field stripping are calculated. The laser power and magnetic field strength needed for different approaches are estimated and compared. The most practical scheme of laser stripping is selected for development.
 
DOI • reference for this paper ※ doi:10.18429/JACoW-NAPAC2022-WEPA33  
About • Received ※ 29 July 2022 — Revised ※ 05 August 2022 — Accepted ※ 09 August 2022 — Issue date ※ 23 August 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPA37 Benchmarking and Exploring Parameter Space of the 2-Phase Bubble Tracking Model for Liquid Mercury Target Simulation target, simulation, neutron, experiment 711
 
  • L. Lin, M.I. Radaideh, H. Tran, D.E. Winder
    ORNL, Oak Ridge, Tennessee, USA
 
  Funding: This project was funded by the U.S. DOE under grant DE-SC0009915.
High intensity proton pulses strike the Spallation Neutron Source (SNS)’s mercury target to provide bright neutron beams. These strikes deposit extensive energy into the mercury and its steel vessel. Prediction of the resultant loading on the target is difficult when helium gas is intentionally injected into the mercury to reduce the loading and to mitigate the pitting damage on the vessel. A 2-phase material model that incorporates the Rayleigh-Plesset (R-P) model is expected to address this complex multi-physics dynamics problem by including the bubble dynamics in the liquid mercury. We present a study comparing the measured target strains in the SNS target station with the simulation results of the solid mechanics simulation framework. We investigate a wide range of various physical model parameters, including the number of bubble families, bubble size distribution, viscosity, surface tension, etc. to understand their impact on simulation accuracy. Our initial findings reveal that using 8-10 bubble families in the model renders a simulation strain envelope that covers the experimental ones. Further optimization studies are planned to predict the strain response more accurately.
 
poster icon Poster WEPA37 [1.985 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-NAPAC2022-WEPA37  
About • Received ※ 27 July 2022 — Revised ※ 08 August 2022 — Accepted ※ 12 August 2022 — Issue date ※ 01 September 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPA72 Analysis of Beam-Induced Heating of the NSLS-II Ceramic Vacuum Chambers impedance, kicker, simulation, vacuum 799
 
  • G. Bassi, C. Hetzel, A. Khan, B.N. Kosciuk, M. Seegitz, V.V. Smaluk, R.J. Todd
    BNL, Upton, New York, USA
  • A. Blednykh
    Brookhaven National Laboratory (BNL), Electron-Ion Collider, Upton, New York, USA
 
  We discuss impedance calculations and related heating issues of the titanium-coated NSLS-II kicker ceramic chambers, with the titanium coating thickness estimated from in situ measurements of the end-to-end resistance of each chamber. Power densities are calculated on the titanium coating to allow for thermal analysis with the code ANSYS and comparison with heating measurements. The impedance analysis is performed using a realistic model of the ceramic complex permittivity, and special consideration is given to the impedance calculation in the limit of zero titanium coating thickness.  
DOI • reference for this paper ※ doi:10.18429/JACoW-NAPAC2022-WEPA72  
About • Received ※ 03 August 2022 — Revised ※ 08 August 2022 — Accepted ※ 10 August 2022 — Issue date ※ 26 September 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPA85 Localized Beam Induced Heating Analysis of the EIC Vacuum Chamber Components vacuum, kicker, electron, simulation 833
 
  • M.P. Sangroula, D.M. Gassner, C.J. Liaw, C. Liu, P. Thieberger
    BNL, Upton, New York, USA
  • J.R. Bellon, A. Blednykh, C. Hetzel, S. Verdú-Andrés
    Brookhaven National Laboratory (BNL), Electron-Ion Collider, Upton, New York, USA
 
  Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-SC0012704 with the U.S. Department of Energy
The Electron-Ion Collider (EIC), to be built at Brookhaven National Laboratory (BNL), is designed to provide a high electron-proton luminosity of 1034 cm-2 s-1. One of the challenging tasks for the Electron Storage Ring (ESR) is to operate at an average beam current of 2.5 A within 1160 bunches with a ~ 7 mm bunch length. The Hadron Storage Ring (HSR) will accumulate an average current of 0.69 A within 290 bunches with a 60 mm bunch length. Both rings require the impedance budget simulations. The intense e-beam in the ESR can lead to the overheating of vacuum chamber components due to localized metallic losses. This paper focuses on the beam-induced heating analysis of the ESR vacuum components including bellows, gate-valve, and BPM. To perform thermal analysis, the resistive loss on individual components is calculated with CST and then fed to ANSYS to determine the temperature distribution on the vacuum components. Preliminary results suggest that active water cooling will be required for most of the ESR vacuum components. Similar approach is applied to the HSR vacuum components. The thermal analysis of the HSR stripline injection kicker is presented.
 
DOI • reference for this paper ※ doi:10.18429/JACoW-NAPAC2022-WEPA85  
About • Received ※ 03 August 2022 — Revised ※ 08 August 2022 — Accepted ※ 10 August 2022 — Issue date ※ 10 September 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THYD1 XFEL as a Low-Emittance Injector for a 4th-Generation Synchrotron Radiation Source electron, emittance, storage-ring, synchrotron 850
 
  • T. Hara
    RIKEN SPring-8 Center, Hyogo, Japan
 
  Low-emittance beam injection is required for the future SPring-8-II due to its small injection beam aperture. To meet this requirement, the SACLA linac has been used as a low-emittance injector since 2020 [1]. In order to perform the beam injection in parallel with XFEL operation, three accelerators are virtually constructed in a control system for the two XFEL beamlines and the beam injection, and thus the accelerator parameters can be independently tuned. Since the reference clock frequencies of the two accelerators are not related by an integer multiple, a new timing system was developed that achieves 3.8 ps (rms) synchronization. To maintain bunch purity better than 1e-8, which is routinely requested at SPring-8, an electron sweeper and an RF knock-out system are introduced for the SACLA injector and the SPring-8 storage ring. Although 0.1 nm-rad emittance of SACLA is increased by an order of magnitude at a transport line mainly due to quantum excitation of synchrotron radiation, it is still small enough for SPring-8-II. By shutting down an old dedicated injector complex, energy consumption has been significantly reduced, and it contributes to create a low-carbon society.
The speaker present this work on behalf of RIKEN-JASRI project team.
[1] Toru Hara et al., Phys. Rev. Accel. Beams 24, 110702 (2021).
 
slides icon Slides THYD1 [10.103 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-NAPAC2022-THYD1  
About • Received ※ 29 July 2022 — Revised ※ 05 August 2022 — Accepted ※ 07 August 2022 — Issue date ※ 23 September 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THYD4 Progress on the APS-U Injector Upgrade booster, simulation, storage-ring, target 859
 
  • J.R. Calvey, T. Fors, K.C. Harkay, U. Wienands
    ANL, Lemont, Illinois, USA
 
  Funding: Work supported by U. S. Department of Energy, Office of Science, under Contract No. DE-AC02-06CH11357.
For the APS-Upgrade, it was decided to leave the present APS injector chain in place and make individual improvements where needed. The main challenges faced by the injectors are delivering a high charge bunch (up to 16 nC in a single shot) to the storage ring, operating the booster synchrotron and storage ring at different rf frequencies, and maintaining good charge stability during APS-U operations. This paper will summarize recent progress on the injector upgrade. Topics include bucket targeting with the new injection/extraction timing system (IETS), modeling of high charge longitudinal instability in the PAR, and measurements of charge stability for different modes of operation.
 
slides icon Slides THYD4 [2.015 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-NAPAC2022-THYD4  
About • Received ※ 19 July 2022 — Accepted ※ 11 August 2022 — Issue date ※ 22 August 2022  
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THZD6 An 8 GeV Linac as the Booster Replacement in the Fermilab Power Upgrade linac, cryomodule, cavity, SRF 897
 
  • D.V. Neuffer, S.A. Belomestnykh, M. Checchin, D.E. Johnson, S. Posen, E. Pozdeyev, V.S. Pronskikh, A. Saini, N. Solyak, V.P. Yakovlev
    Fermilab, Batavia, Illinois, USA
 
  Funding: Work supported by the Fermi National Accelerator Laboratory, managed and operated by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the U.S. Department of Energy.
Increasing the Main Injector (MI) beam power above ~1.2 MW requires replacement of the 8-GeV Booster by a higher intensity alternative. In the Project X era, rapid-cycling synchrotron (RCS) and linac solutions were considered for this purpose. In this paper, we consider the linac version that produces 8 GeV H beam for injection into the Recycler Ring (RR) or Main Injector (MI). The linac takes ~1-GeV beam from the PIP-II Linac and accelerates it to ~2 GeV in a 650-MHz SRF linac, followed by a 8-GeV pulsed linac using 1300 MHz cryomodules. The linac components incorporate recent improvements in SRF technology. Research needed to implement the high power SRF Linac is described.
 
slides icon Slides THZD6 [4.078 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-NAPAC2022-THZD6  
About • Received ※ 03 August 2022 — Revised ※ 11 August 2022 — Accepted ※ 12 August 2022 — Issue date ※ 04 October 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)